[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[ns] Dynamic varying the transfer rate of CBR.




Hi 

Can ns dynamically varies or changes CBR rates in a simulation.

Say the length of simulation is 100s, and I want from 0 - 50s CBR rate_ 500k.
Then at 51 - 100s CBR rate_ 1M.

Is it possible?


Cheers,

Many thanks

Don